Click on the link to see the various states of contstruction for my workshop - 2004



The Site of Construction






The Excavation


The Footers


The Foundation Framing


The Foundation Wall


The Gravel and Rebar for Slab


The Floor Slab


The Framing of the Walls


The Framed Walls Go UP!


The Roof Goes UP.


The framing is done and the shingles on ready for finishing.


Rough in wiring waiting for inspection.


Garage door and opener installed.


Inside walls and window trim goes up after passing the electric inspection.


A workbench and cabinets.


The House wrap before the siding.


The kids helped me get the siding up over the 4th weekend.


The electric trim is in and working. July 14, 2004


The siding is painted and primer on the trim. July 17, 2004


The Eagle has Landed July 20, 2004. It is all done.


The tools set up in the workshop, July 21, 2004.