Workshop
Click on the link to see the various states of contstruction for my workshop - 2004
The Site of Construction
![](begin.jpg)
![](done.jpg)
The Excavation
The Footers
The Foundation Framing
The Foundation Wall
The Gravel and Rebar for Slab
The Floor Slab
The Framing of the Walls
The Framed Walls Go UP!
The Roof Goes UP.
The framing is done and the shingles on ready for finishing.
Rough in wiring waiting for inspection.
Garage door and opener installed.
Inside walls and window trim goes up after passing the electric inspection.
A workbench and cabinets.
The House wrap before the siding.
The kids helped me get the siding up over the 4th weekend.
The electric trim is in and working. July 14, 2004
The siding is painted and primer on the trim. July 17, 2004
The Eagle has Landed July 20, 2004. It is all done.
The tools set up in the workshop, July 21, 2004.